CWF-AUD-COMAH-01 · Blank editable master · Owner role: Process safety and COMAH lead
Crownway Fuels Ltd MAPP and SMS effectiveness audit
Blank working master. Provide the site/task-specific mapp and sms effectiveness audit and retain its controlled output. Record actual evidence and limitations; no result or approval is prefilled.
Complete this form against the actual work observed. Record samples, answers and evidence; assign each gap to a corrective action.
| Audit details and document control |
| Site or workplace | Click here to enter details | Audit reference | Enter local reference |
| Assessor | Enter name and role | Date | Enter date |
| Organisation or client | Enter organisation | Template version | 1.0 |
| Account context | Organisation example | Jurisdiction | England example; confirm actual scope and dutyholder |
| Scope and criteria | BULK. Apply to the requested lower-tier scenario only; verify inventory, configuration and jurisdiction. Suspend the affected activity when a required major-accident barrier is unavailable without an approved, time-limited safe alternative; unresolved risk is escalated to the site accountable manager and board. | Review status | Blank template for tailoring |
How to complete the offline audit
Tick or initial one response box for each check. Enter observations in the table and use the check reference when recording actions or evidence. Explain every not-applicable answer. Record the task, shift, asset or document sampled, sample size and limitations.
Add your logo through Company logo in the online audit. For offline use, double-click the top of the page and insert your company logo in the header. Cells expand as you type. Add rows with Word table controls. Insert photographs inline in the observation cell or on an evidence sheet; keep the image inside the cell width. Duplicate the evidence and action sheets when more space is needed.
Yes = 2; partial = 1; no = 0. Not applicable is excluded with a reason. Unanswered questions remain incomplete. Scores are not certification of safety or legal compliance. Escalate immediate danger without waiting for the audit to finish.
Great Britain baseline. Confirm local fire, environmental and sector criteria. Northern Ireland has separate legislation.
Sampling and audit boundaries
| Field | Record details |
| Activities assets and shifts sampled | Click here to enter details
|
| Documents and people consulted | Click here to enter details
|
| Sample size and selection method | Click here to enter details
|
| Excluded areas and limitations | Click here to enter details
|
Checklist section index
7 checks across 1 sections. Use the heading navigation or check reference to return to a section.
Major accident prevention and proportionate safety management | C001 to C007
Major accident prevention and proportionate safety management
| Check and evidence to examine | Response | Observations and evidence references |
C001 Sample implemented controls and records against policy checked for this scope Evidence prompt: Check sample implemented controls and records against policy against the actual work and current supporting evidence. Record the reference, finding, uncertainty and required action. Critical control — contain and escalate failure immediately | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
C002 Scenarios and SMS arrangements checked for this scope Evidence prompt: Check scenarios and sms arrangements against the actual work and current supporting evidence. Record the reference, finding, uncertainty and required action. Critical control — contain and escalate failure immediately | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
C003 Independence checked for this scope Evidence prompt: Check independence against the actual work and current supporting evidence. Record the reference, finding, uncertainty and required action. Critical control — contain and escalate failure immediately | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
C004 Findings and closure checked for this scope Evidence prompt: Check findings and closure against the actual work and current supporting evidence. Record the reference, finding, uncertainty and required action. | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
C005 Affected shifts people and simultaneous activities addressed Evidence prompt: Check the actual site, customers, contractors, adjacent activities and changes relevant to mapp and sms effectiveness audit. | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
C006 Stop conditions and escalation understood Evidence prompt: Suspend the affected activity when a required major-accident barrier is unavailable without an approved, time-limited safe alternative; unresolved risk is escalated to the site accountable manager and board. Critical control — contain and escalate failure immediately | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
C007 Evidence actions and verification assigned Evidence prompt: Retain the actual evidence, action owner, due date, interim restriction and competent verifier. Completion of this sheet does not release work. | Yes
Partial
No
N/A
| Observation / N/A reason:
Evidence or photo ref: Action ref: |
SHARE background reading: What Process Safety Management Is
Findings and corrective actions
Link each finding to its check reference. Record containment, the required action, a named owner and due date. Closure requires evidence and an effectiveness check.
| Action A001 |
| Check reference and finding | Check ref: Finding:
|
| Immediate control | Enter containment and who authorised it
|
| Required action | Enter action and intended outcome
|
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
| Action A002 |
| Check reference and finding | Check ref: Finding:
|
| Immediate control | Enter containment and who authorised it
|
| Required action | Enter action and intended outcome
|
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
| Action A003 |
| Check reference and finding | Check ref: Finding:
|
| Immediate control | Enter containment and who authorised it
|
| Required action | Enter action and intended outcome
|
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
| Action A004 |
| Check reference and finding | Check ref: Finding:
|
| Immediate control | Enter containment and who authorised it
|
| Required action | Enter action and intended outcome
|
| Owner and contact | Name: Contact: |
| Due date priority and status | Due: Priority: Status: |
| Completion evidence | Evidence ref: Completed by / date: |
| Verification and effectiveness | Verifier: Date: Outcome / reopening: |
Photographic evidence and additional detail
Duplicate this sheet for each image or supporting record. Link the evidence to a check or action. Add a caption describing what the image shows and why it supports the finding. Keep photographs inline and proportional.
Evidence sheet 1
| Evidence sheet 1 |
| Evidence and check reference | Evidence ref: Check / action ref: |
| Location asset and date | Location / asset: Taken by / date: |
Insert photograph or supporting image here Select this cell then Insert > Pictures. Resize within the cell.
|
| Caption and factual observation | Enter what is visible and its relevance to the finding
|
| Further detail or record reference | Enter measurements, document references and limitations
|
Evidence sheet 2
| Evidence sheet 2 |
| Evidence and check reference | Evidence ref: Check / action ref: |
| Location asset and date | Location / asset: Taken by / date: |
Insert photograph or supporting image here Select this cell then Insert > Pictures. Resize within the cell.
|
| Caption and factual observation | Enter what is visible and its relevance to the finding
|
| Further detail or record reference | Enter measurements, document references and limitations
|
Review and sign off
| Review field | Review and approval record |
| Assessor review | Name: Signature: Date:
|
| Outstanding critical controls | Record restrictions, escalation and authority for restart
|
| Verifier and closure decision | Name: Signature: Date: Decision:
|
| Follow up review | Review date: Scope and effectiveness checks:
|
Reference guidance
Primary guidance 1 | Primary guidance 2
Primary references: comah15 | official requirements