Legionella: responsibilities and water-system control · detailed source study

Optional reference study from the SHAREhub topic pages and selected source records used for this course. The core learning-time estimate excludes this extended reference.

What health boundary should readers understand?
What health boundary should readers understand?

Source: legionella-management--boundary

This page is workplace and premises guidance, not medical advice. Suspected Legionnaires' disease, illness after aerosol exposure or an outbreak concern should be escalated through medical and public-health routes while the dutyholder secures records and reviews controls. Managers should not attempt to diagnose illness. Their role is to prevent exposure, cooperate with competent water-treatment specialists, provide accurate water-system records, act on microbiological results, support any investigation and protect worker or occupant health information. Legionella risk is environmental rather than person-to-person in normal workplace management. The prevention focus is therefore water-system design, temperature, stagnation, biofilm, aerosol generation, monitoring and maintenance.

After possible water-aerosol exposure, contact a GP or local urgent-care service promptly for relevant illness and tell the clinician where and when the exposure occurred, including recent stays and water systems. NHS guidance identifies chest pain or breathlessness as reasons for urgent help; use 999 for a life-threatening emergency. Do not wait for water-sampling results or an internal investigation before seeking care. Use England’s NHS 111, NHS 24 in Scotland, NHS 111 Wales or the local GP/out-of-hours/Phone First route in NI as appropriate.

What is legionella management in plain English?

Source: legionella-management--plain-english

Legionella management means keeping water systems in a condition that does not allow dangerous bacterial growth and aerosol exposure. Legionella bacteria can exist naturally at low levels, but building water systems can create better growth conditions: warm temperatures, stored water, poor circulation, scale, sludge, biofilm and nutrients. If that water is sprayed or aerosolised, people can inhale droplets deep into the lungs. Good management is not just taking occasional samples. It is a cycle: know the system, assess the risk, appoint competent responsibility, write the control scheme, monitor the controls, fix defects, keep records and review after change. Sampling can support assurance, but it cannot rescue a poorly understood or poorly maintained system.

How does legionella grow and cause risk?
How does legionella grow and cause risk?

Source: legionella-management--biology

Learners need the biological logic because it explains why the control scheme looks the way it does. The common teaching model is simple: water system conditions allow growth, aerosol generation allows inhalation, susceptible people may develop illness. The strongest controls break that chain by keeping cold water cold, hot water hot, preventing stagnation, cleaning deposits, treating water and controlling aerosol-producing equipment. Temperature alone is not enough. A calorifier may be hot, but a long dead leg, poorly used shower, thermostatic mixing valve or neglected storage tank can still create local risk. This is why monitoring must be connected to system knowledge.

Which water systems need attention?

Source: legionella-management--systems

Any system that stores or circulates water and can create aerosols should be considered. HSG274 separates technical guidance across evaporative cooling, hot and cold water systems and other risk systems. In practical terms, dutyholders should map their systems: tanks, calorifiers, showers, outlets, cooling towers, spa pools, fountains, vehicle washes, misting systems, emergency showers and specialist process equipment. Small premises are not exempt from thinking. A simple system may need simple controls, but little-used outlets, poor records or unclear responsibility can still create unmanaged risk.

Who should own legionella management?

Source: legionella-management--responsibility

The dutyholder must make sure responsibility is competent, named and resourced. A responsible person should have sufficient authority, competence and support to implement the control scheme. In larger organisations, there may be an appointed responsible person, deputies, facilities managers, maintenance contractors, water-treatment specialists and site users who all have defined roles. Outsourcing does not remove dutyholder responsibility. Contractors can provide specialist advice, monitoring and maintenance, but the organisation still needs to understand what is being done, review reports and close defects.

What should a legionella risk assessment cover?

Source: legionella-management--risk-assessment

The assessment should describe the water system and determine whether conditions could support growth and aerosol exposure. A useful legionella risk assessment is not a generic folder with a logo on it. It should be specific to the building or system: schematic, asset list, outlet use, temperature profile, dead legs, storage, materials, users, susceptible people, aerosol points, maintenance access, control strategy and records. The assessment should be reviewed when the system changes, use changes, monitoring fails, an illness is suspected, occupancy changes, controls are not maintained or new guidance/evidence suggests the risk has changed. HSE L8 requires a system-specific risk assessment and a responsible person.

How can the hierarchy of controls control Legionella growth and harmful aerosol exposure?
How can the hierarchy of controls control Legionella growth and harmful aerosol exposure?

Source: legionella-management--control-scheme

The written scheme explains how the risk assessment will be controlled in daily practice. A written control scheme should be practical enough for the people using it. It should identify the system, responsible roles, control measures, monitoring, frequencies, action levels, cleaning, disinfection, sampling if needed, record keeping and escalation. The scheme should also explain what to do when controls fail. For example, if hot water does not reach the required temperature, the issue should not sit as a note in a contractor report for three months. It needs risk assessment, interim controls, repair ownership and verification. Use ERICPD with the five-level hierarchy to choose physical water-system controls. L8 requires a scheme of control where risk exists, while HSG274 gives system-specific technical advice.

Every selected measure needs an owner, check, failure action and record; flushing alone does not compensate for a badly designed stagnant system.

What does a practical water-system control scheme look like?

Source: legionella-management--worked-scheme

A worked scheme helps dutyholders understand how L8/HSG274-style arrangements become everyday facilities management. Take a medium-sized leisure and office building with changing-room showers, staff kitchens, hot and cold water storage, thermostatic mixing valves, a plant room, a small number of little-used outlets and an external water-treatment contractor. A useful control scheme would not simply say 'contractor checks legionella'. It would define the system, responsible person, monitoring tasks, action limits, contractor role, records and review triggers. The best schemes make exceptions visible. A missed flush, a cold outlet repeatedly above target, a hot outlet slow to reach temperature, a removed shower hose, a dead leg found during refurbishment or a contractor recommendation should all move into an action tracker with an owner and verification date.

How does temperature control work?

Source: legionella-management--temperature

For hot and cold water systems using temperature as the main control, keep cold water below 20°C where possible, hot water stored at least 60°C and outlets at 50°C within one minute (55°C in healthcare). HSE hot-and-cold system guidance gives these control benchmarks and says system size and type matter. The outlet reading must be taken at the relevant measurement point, including upstream of a thermostatic mixing valve where fitted. A scalding risk requires a suitable separate control. These numbers are not a universal design for a cooling tower, spa pool or chemical-control regime. The responsible person writes location-specific limits, frequency, method, action and escalation into the scheme.

A warm cold-water outlet, slow hot-water rise, dead leg or failed mixing-valve check needs investigation and an interim exposure decision; record repair and a confirming test. HSG274 Part 2 supplies technical detail for hot and cold systems. The HSG274 second-edition update in March 2024 applies to Part 1 only.

How should a closed building's water system be returned to use?
How should a closed building's water system be returned to use?

Source: legionella-management--reopening-decision

Return to use should be a planned water-system decision, not a date on a booking calendar. A period of low use changes the risk assessment because water movement, temperature and the population using the building may have changed. The competent responsible person must establish the system's condition and the controls needed before users are exposed to aerosols. Related guidance: L8 ACOP and guidance. In an illustrative leisure building, a changing-room wing has been closed while adjacent rooms remained occupied. The current drawing shows the main hot-water circuit but not a shower removed during refurbishment. The responsible person holds reopening of the affected wing and commissions a survey to reconcile actual pipework, outlets, mixing valves and monitoring points.

The issue is a gap in system knowledge; a contractor's completion certificate alone cannot fill it. Related guidance: L8 ACOP and guidance. The competent team then defines the recommissioning method for this hot-and-cold system, including cleaning, flushing, treatment and sampling where the assessment requires them. Plan access, safe work with chemicals and hot water, aerosol exposure and protection of people in the occupied wing. Do not improvise a thermal-disinfection recipe from a normal outlet-temperature benchmark or apply a hot-and-cold procedure to a spa or cooling system. Related guidance: L8 ACOP and guidance. Before release, the responsible person checks the revised schematic, the work records, identified exceptions and the evidence that the specified control regime has been restored at the relevant locations.

Contractor scope must make clear who interprets results and who decides restrictions. A missing result or unresolved stagnant branch remains an explicit open issue; a booking commitment is not a substitute for the water-system decision. Related guidance: L8 ACOP and guidance. Hand-back names the outlets released, continuing restrictions, monitoring arrangements, responsible person and deputy, and conditions triggering reassessment. Facilities staff demonstrate the checks they now own and the escalation route when an outlet fails. If user susceptibility or occupancy changes again, review the assessment and scheme rather than assuming the previous commissioning decision covers the new use. Related guidance: L8 ACOP and guidance. Guidance for these decisions: L8 ACOP and guidance; HSG274 technical guidance; L8 approved for use in NI.

Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.

Why do a small office and a cooling tower need different decisions?
Why do a small office and a cooling tower need different decisions?

Source: legionella-management--different-system-decisions

Assessment should be proportionate to the actual system. For a simple, regularly used premises system, a competent assessment may establish no reasonably foreseeable risk, or low risk that is already properly managed. HSE says no further action may then be needed at that stage; existing controls still need maintenance and the assessment needs review. This is an assessment outcome, not an exemption based on the size of the business. Related guidance: L8 ACOP and guidance. HSE: Identify and assess sources of risk. For an illustrative evaporative cooling system, a routine report records a free-halogen result without stating how cooling-water pH was considered. The responsible person asks the competent water-treatment specialist to establish the test method, system conditions and interpretation against HSG274 Part 1.

The March 2024 update of Part 1 specifically stresses pH correction of free-halogen results. This page supplies no dose, target concentration or correction calculation. Related guidance: HSG274 technical guidance. A domestic hot-water outlet temperature cannot answer that cooling-system question. The specialist checks the treatment and monitoring scheme, relevant operating results and any failure response; the responsible person records what activity is restricted and the evidence required for recovery. A normal result copied from another plant cannot close the uncertainty. Cooling-system discharge, drift and exposure interfaces also need their own assessment. Related guidance: HSG274 technical guidance. For both cases, explain why the selected route fits the actual plant and people. Keep the low-risk assessment under review, and keep complex cooling-system decisions within competent specialist scope.

HSG274 is labelled UK technical guidance, while the legal instruments and approved-code route remain those applicable to Great Britain or Northern Ireland. Related guidance: HSG274 technical guidance; L8 approved for use in NI. Guidance for these decisions: L8 ACOP and guidance; HSG274 technical guidance. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.

What monitoring and sampling may be needed?
What monitoring and sampling may be needed?

Source: legionella-management--monitoring

Monitoring confirms whether the control scheme is being implemented and remains effective. Routine monitoring commonly includes temperatures, visual checks, treatment levels where used, flushing records, cleaning tasks and action close-out. Microbiological sampling may be needed depending on system type, risk, control method, history and competent advice. A sample result without action discipline is weak. The report should be reviewed, results interpreted, any restrictions considered, the system cleaned or disinfected where needed, causes investigated and the written scheme updated if the result shows a control weakness. HSE HSG274 gives system-specific monitoring detail; the written scheme should set methods, frequencies and corrective actions.

How should cleaning, flushing and disinfection be managed?

Source: legionella-management--cleaning

Cleaning and flushing are controls only when they are planned, competent and recorded. Flushing little-used outlets helps prevent stagnation, but it has to be done safely because flushing itself can create aerosols. Cleaning and disinfection should be undertaken by competent people using suitable methods, chemicals and precautions. Design improvement is often better than permanent flushing. If an outlet is never used, removal may be stronger than relying on a weekly tick sheet forever. The control scheme should challenge why stagnant sections exist.

How should legionella contractors be managed?

Source: legionella-management--contractors

Specialist support helps, but dutyholders must remain informed and in control. Contractors should be selected for competence, scope and ability to explain findings clearly. The contract should define monitoring, sampling, reporting timescales, escalation, defect management, emergency response and record handover. Reports should not sit unread in a portal. The responsible person should challenge repeated failures, unclear recommendations and closed actions without verification. If a contractor identifies a recurring temperature issue, the dutyholder should ask whether design, use, balancing, maintenance or occupancy has changed.

What records should be kept for legionella management?

Source: legionella-management--records

Records are a core part of L8-style control because they show the system is understood and managed. Records should prove that controls were selected, implemented, checked and improved. The table helps distinguish useful evidence from records that exist only because someone expected a document. HSE record guidance distinguishes current scheme records, kept while current and at least two more years, from monitoring records kept at least five years. HSE’s general legionella record guidance distinguishes the five-employee recording threshold from recommended records. Smaller employers still assess and control risks; retaining a proportionate scheme and monitoring evidence is good practice and specific sector or control obligations may also apply.

How do you distinguish a bad reading from a failing control?
How do you distinguish a bad reading from a failing control?

Source: legionella-management--water-exception-analysis

An unexpected reading starts an investigation and an exposure decision. First establish which asset and measurement point it describes, how the reading was obtained and whether it can be compared with the scheme's intended parameter. A repeat measurement can clarify evidence, but it should not erase the original failure or delay necessary protective action. Related guidance: Hot and cold water systems. At a shower with a thermostatic mixing valve, the blended temperature and the upstream hot-water temperature answer different questions. A scald-protection setting cannot be read as direct proof that the upstream circulation is inadequate or adequate. Keep both controls in view and obtain competent advice on measurement, valve function and the affected users before changing settings. Related guidance: Hot and cold water systems.

Suppose the remote log is normal while manual checks from a distant branch are repeatedly outside the scheme. Check whether the sensor observes that branch, whether its location and calibration are suitable, and whether outlet use or pipework has changed. A negative sample from a different point or date cannot close a temperature-control failure by itself. Review the relevant control regime and sampling purpose together. Related guidance: Hot and cold water systems. An observed competence check asks the facilities technician to identify the correct asset, use the agreed measurement method, record the actual result and escalate an exception. The responsible person must demonstrate a proportionate restriction and recovery decision; the contractor must explain limitations of the test.

The dutyholder checks that competent cover, access and budget exist to act on failures. Related guidance: Hot and cold water systems. Guidance for these decisions: Hot and cold water systems; Keeping legionella records; HSG274 technical guidance. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.

What should happen if controls fail or illness is suspected?
What should happen if controls fail or illness is suspected?

Source: legionella-management--response

The response should protect people, preserve evidence and restore control. The response should protect people, preserve evidence and restore control. A failed temperature or treatment result needs an immediate exposure decision, a named repair owner and a confirming check before the affected system is handed back. HSE L8 calls for prompt action when controls fail or a suspected case exposes a possible system gap; protect users and seek competent advice before hand-back.

How does legionella management differ by sector?

Source: legionella-management--examples

The control principles stay the same, but the system and people at risk change. The control principles stay the same, but the system and people at risk change. A shower block, care home and cooling system produce different aerosols and expose different people; the written scheme must fit the assets and users.

How could Riverside Leisure Ltd manage this in practice?

Source: legionella-management--business-example

Riverside Leisure Ltd would treat legionella as a facilities, public health and governance risk across showers, plant rooms, spa features and maintenance work. Riverside Leisure Ltd is a fictional leisure operator. Its responsible person maintains a water-system risk assessment, written scheme, flushing programme, temperature records, contractor reports and defect action tracker for public and staff areas. HSE L8.

How can competence be demonstrated on the real task?

Source: legionella-management--observed-role-assessment

Competence needs to match the water system, responsibilities and decisions allocated. A technician trained for domestic outlet measurements is not thereby competent to commission an evaporative cooling system. Appointment of a responsible person needs evidence of system knowledge, authority and access to competent help; a course title alone cannot supply those resources. Related guidance: L8 ACOP and guidance. Run an observed exercise using the actual schematic and a safe simulated failed reading. Ask the participant to identify the measurement location, explain its meaning, preserve the result and select the escalation or restriction within their role. The assessor should understand the relevant system and method. Do not create a live exposure, defeat a mixing valve or improvise treatment to test a trainee.

Related guidance: L8 ACOP and guidance. Retain the task, system, assessor, observed reasoning, assigned limits and learning action. Reassess after altered pipework, a change of system type or users, recurring failures, lost cover or evidence that the person cannot perform their duty. The dutyholder must ensure a competent deputy arrangement is practical when the usual responsible person is absent. Related guidance: L8 ACOP and guidance. Guidance for these decisions: L8 ACOP and guidance; HSG274 technical guidance; Keeping legionella records. Apply the legal route for the work location; illustrative scenarios are SHARE teaching examples.

What training is needed for legionella management?
What training is needed for legionella management?

Source: legionella-management--training

Training should match responsibility: awareness for users, practical checks for facilities teams and technical competence for responsible people and specialists. Training should be role-based. General awareness creates a baseline, but supervisors, managers, advisers and senior leaders need different levels of decision-making, verification and escalation competence. HSE L8.

How should learners explain legionella management?

Source: legionella-management--study

Strong answers connect biology, systems, legal duties, control scheme, monitoring and records. Strong answers connect biology, systems, legal duties, control scheme, monitoring and records. Explain where legionella can grow, how aerosol reaches people, who owns the written scheme and what a failed monitoring result changes.

Which legal duties apply to legionella management?

Source: legionella-management--legal

Apply the legal route for the work location and test the actual controls, responsibilities and records. Great Britain and Northern Ireland have distinct primary and management regulations. Official guidance helps interpret practical arrangements, but is not a replacement for the applicable instrument. Specialist legal advice is needed for a disputed duty or enforcement decision. Check the separate notification/reporting duties. In GB, assess whether a cooling tower or evaporative condenser is a notifiable device, notify the local authority in writing and keep required details current, including cessation of use. For diagnosed work-related legionellosis, separately assess RIDDOR using the work connection and applicable reporting criteria. A positive water sample alone is not a diagnosed reportable disease.

In Northern Ireland, notify the local authority in writing about a cooling tower or evaporative condenser and when it stops being used; obtain its notification form from that authority’s environmental-health service. For employer disease reporting, HSENI describes NI RIDDOR 1997 legionellosis cases where a doctor has notified the employer and the employee’s current work involves potentially contaminated workplace water-service systems. Use HSENI’s Report of a case of disease (NI2508A) route when those criteria apply. HSENI accepts work-related reports across enforcing-authority areas and forwards relevant reports to district councils. Public-health escalation and an employer’s statutory report are distinct.

How should controls be owned and reviewed?
How should controls be owned and reviewed?

Source: legionella-management--iso

Assign a competent owner, check that task controls work, involve workers and act when evidence changes. For Legionella Management, record the actual hazard and task, the chosen control, the person responsible, the evidence that it works and the point at which work must stop or be reassessed. HSE management guidance for Great Britain describes planning, worker consultation, checking and action. HSENI guidance for Northern Ireland describes competent help, risk control and review. These management steps do not prove that a particular task control is suitable; use the topic-specific evidence and the applicable GB or NI law elsewhere on this page. Where ISO 45001 is adopted, connect water-system responsibilities, contractor scope, failed readings and verified recovery to the existing management arrangements.

The actual system risk assessment and control scheme govern the water decision. Certification cannot confirm a temperature regime, treatment result or release of a closed wing. HSE: ISO 45001 management standard.

What warning signs show legionella is not managed?

Source: legionella-management--warning-signs

Most failures show up as missing ownership, poor records, repeated temperature issues or passive contractor reports. Warning signs are included because failure usually appears before a serious event. Treat these points as prompts for inspection, audit, supervision and management review rather than as simple compliance statements. HSE L8.

Source tables and records 1
Workplace role versus health/public-health role

Table ID: legionella-management-workplace-role-versus-health-public-health-role

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Issue

Symptoms

Dutyholder role

Record reported work context and escalate appropriately.

Medical public health role

Assess and treat the individual.

Row 2

Issue

Positive water result

Dutyholder role

Review control scheme, restrict use if needed and clean/disinfect.

Medical public health role

Advise on health/public-health response if illness is involved.

Row 3

Issue

Outbreak concern

Dutyholder role

Preserve records and cooperate with authorities.

Medical public health role

Lead clinical/public-health investigation.

Row 4

Issue

Worker privacy

Dutyholder role

Keep health information limited and secure.

Medical public health role

Handle clinical details confidentially.

Read the complete comparison table
Workplace role versus health/public-health role
RowIssueDutyholder roleMedical public health role
1SymptomsRecord reported work context and escalate appropriately.Assess and treat the individual.
2Positive water resultReview control scheme, restrict use if needed and clean/disinfect.Advise on health/public-health response if illness is involved.
3Outbreak concernPreserve records and cooperate with authorities.Lead clinical/public-health investigation.
4Worker privacyKeep health information limited and secure.Handle clinical details confidentially.
Legionella management basics

Table ID: legionella-management-legionella-management-basics

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Question

What is the hazard?

Plain answer

Legionella bacteria in water systems.

Why it matters

Can cause serious pneumonia-type illness.

Row 2

Question

How are people exposed?

Plain answer

By inhaling contaminated aerosols.

Why it matters

Controls focus on water and droplet creation.

Row 3

Question

What grows it?

Plain answer

Warm temperature, stagnation, nutrients, scale and biofilm.

Why it matters

Maintenance and design matter.

Row 4

Question

What controls it?

Plain answer

Temperature, biocide/treatment, flow, cleaning and monitoring.

Why it matters

Control strategy must match the system.

Row 5

Question

What proves it?

Plain answer

Risk assessment, schematic, written scheme, monitoring and action records.

Why it matters

Evidence protects people and dutyholders.

Read the complete comparison table
Legionella management basics
RowQuestionPlain answerWhy it matters
1What is the hazard?Legionella bacteria in water systems.Can cause serious pneumonia-type illness.
2How are people exposed?By inhaling contaminated aerosols.Controls focus on water and droplet creation.
3What grows it?Warm temperature, stagnation, nutrients, scale and biofilm.Maintenance and design matter.
4What controls it?Temperature, biocide/treatment, flow, cleaning and monitoring.Control strategy must match the system.
5What proves it?Risk assessment, schematic, written scheme, monitoring and action records.Evidence protects people and dutyholders.
Legionella risk chain

Table ID: legionella-management-legionella-risk-chain

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Stage

Source

What happens

Bacteria present in water or introduced into a system.

Control focus

System design and water quality.

Row 2

Stage

Growth

What happens

Warm stagnant water, biofilm, sludge or scale supports multiplication.

Control focus

Temperature, turnover, cleaning and treatment.

Row 3

Stage

Aerosol

What happens

Water droplets are created by showers, sprays or cooling systems.

Control focus

Control aerosol-generating equipment.

Row 4

Stage

Exposure

What happens

People inhale droplets.

Control focus

Restrict use, maintain systems and protect high-risk areas.

Row 5

Stage

Illness

What happens

Susceptible people may develop legionellosis.

Control focus

Medical/public-health response and prevention review.

Read the complete comparison table
Legionella risk chain
RowStageWhat happensControl focus
1SourceBacteria present in water or introduced into a system.System design and water quality.
2GrowthWarm stagnant water, biofilm, sludge or scale supports multiplication.Temperature, turnover, cleaning and treatment.
3AerosolWater droplets are created by showers, sprays or cooling systems.Control aerosol-generating equipment.
4ExposurePeople inhale droplets.Restrict use, maintain systems and protect high-risk areas.
5IllnessSusceptible people may develop legionellosis.Medical/public-health response and prevention review.
Legionella risk systems

Table ID: legionella-management-legionella-risk-systems

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

System

Cooling towers and evaporative condensers

Why it matters

High aerosol potential and complex water treatment needs.

Control focus

Written scheme, treatment, monitoring and competent maintenance.

Row 2

System

Hot and cold water systems

Why it matters

Common in most buildings.

Control focus

Temperature, flushing, outlets, tanks and TMVs.

Row 3

System

Showers and spray taps

Why it matters

Aerosol generation close to users.

Control focus

Cleaning, flushing and temperature control.

Row 4

System

Spa pools and hot tubs

Why it matters

Warm agitated water creates high aerosol risk.

Control focus

Strict treatment, cleaning and monitoring.

Row 5

System

Vehicle washes and pressure washers

Why it matters

Aerosols from stored or recirculated water.

Control focus

Water quality, cleaning and use controls.

Row 6

System

Emergency showers and eyewash

Why it matters

May be rarely used but critical when needed.

Control focus

Flushing and inclusion in scheme.

Row 7

System

Metalworking fluid systems

Why it matters

Water-mix fluids can create aerosols in special circumstances.

Control focus

Fluid quality, bacterial control and avoiding jet washing biofilm.

Read the complete comparison table
Legionella risk systems
RowSystemWhy it mattersControl focus
1Cooling towers and evaporative condensersHigh aerosol potential and complex water treatment needs.Written scheme, treatment, monitoring and competent maintenance.
2Hot and cold water systemsCommon in most buildings.Temperature, flushing, outlets, tanks and TMVs.
3Showers and spray tapsAerosol generation close to users.Cleaning, flushing and temperature control.
4Spa pools and hot tubsWarm agitated water creates high aerosol risk.Strict treatment, cleaning and monitoring.
5Vehicle washes and pressure washersAerosols from stored or recirculated water.Water quality, cleaning and use controls.
6Emergency showers and eyewashMay be rarely used but critical when needed.Flushing and inclusion in scheme.
7Metalworking fluid systemsWater-mix fluids can create aerosols in special circumstances.Fluid quality, bacterial control and avoiding jet washing biofilm.
Legionella responsibility map

Table ID: legionella-management-legionella-responsibility-map

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Role

Dutyholder

Typical responsibility

Ensure risk is assessed and managed.

Evidence

Appointment and governance records.

Row 2

Role

Responsible person

Typical responsibility

Manage day-to-day control scheme and records.

Evidence

Named appointment and competence record.

Row 3

Role

Deputy

Typical responsibility

Cover absence and support continuity.

Evidence

Deputy appointment and briefing.

Row 4

Role

Facilities/maintenance

Typical responsibility

Carry out checks, flushing, repairs and contractor coordination.

Evidence

Logs and work orders.

Row 5

Role

Water-treatment specialist

Typical responsibility

Advise, sample, treat, clean or inspect as contracted.

Evidence

Reports, certificates and recommendations.

Row 6

Role

Building users

Typical responsibility

Report temperature problems, unused outlets or defects.

Evidence

Communication and reporting route.

Read the complete comparison table
Legionella responsibility map
RowRoleTypical responsibilityEvidence
1DutyholderEnsure risk is assessed and managed.Appointment and governance records.
2Responsible personManage day-to-day control scheme and records.Named appointment and competence record.
3DeputyCover absence and support continuity.Deputy appointment and briefing.
4Facilities/maintenanceCarry out checks, flushing, repairs and contractor coordination.Logs and work orders.
5Water-treatment specialistAdvise, sample, treat, clean or inspect as contracted.Reports, certificates and recommendations.
6Building usersReport temperature problems, unused outlets or defects.Communication and reporting route.
Legionella risk assessment content

Table ID: legionella-management-legionella-risk-assessment-content

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Assessment area

System description

What to check

Tanks, calorifiers, outlets, TMVs, loops and aerosol points.

Evidence

Schematic and asset register.

Row 2

Assessment area

Temperature profile

What to check

Cold, hot, return and outlet temperatures.

Evidence

Temperature logs and trend review.

Row 3

Assessment area

Stagnation

What to check

Dead legs, little-used outlets and low turnover.

Evidence

Flushing schedule and removal plan.

Row 4

Assessment area

Susceptible people

What to check

Healthcare, older users, immune-compromised people or public exposure.

Evidence

Occupancy profile.

Row 5

Assessment area

Control strategy

What to check

Temperature, chemical treatment, cleaning or other controls.

Evidence

Written scheme.

Row 6

Assessment area

Monitoring

What to check

What is checked, when, by whom and against what action levels.

Evidence

Monitoring programme.

Row 7

Assessment area

Review triggers

What to check

Change, poor results, defects, illness or occupancy change.

Evidence

Review log.

Read the complete comparison table
Legionella risk assessment content
RowAssessment areaWhat to checkEvidence
1System descriptionTanks, calorifiers, outlets, TMVs, loops and aerosol points.Schematic and asset register.
2Temperature profileCold, hot, return and outlet temperatures.Temperature logs and trend review.
3StagnationDead legs, little-used outlets and low turnover.Flushing schedule and removal plan.
4Susceptible peopleHealthcare, older users, immune-compromised people or public exposure.Occupancy profile.
5Control strategyTemperature, chemical treatment, cleaning or other controls.Written scheme.
6MonitoringWhat is checked, when, by whom and against what action levels.Monitoring programme.
7Review triggersChange, poor results, defects, illness or occupancy change.Review log.
Written control scheme contents

Table ID: legionella-management-written-control-scheme-contents

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Scheme element

Roles

What it should say

Who does what and who reviews.

Why it matters

Prevents orphaned tasks.

Row 2

Scheme element

Control parameters

What it should say

Temperature, treatment or other performance criteria.

Why it matters

Defines what good looks like.

Row 3

Scheme element

Monitoring frequency

What it should say

Daily, weekly, monthly, quarterly or annual tasks as appropriate.

Why it matters

Keeps checks consistent.

Row 4

Scheme element

Action levels

What it should say

What triggers repair, cleaning, restriction or escalation.

Why it matters

Prevents passive logging.

Row 5

Scheme element

Schematic

What it should say

System layout and high-risk points.

Why it matters

Helps find stagnation and dead legs.

Row 6

Scheme element

Contractor duties

What it should say

Scope, reporting, escalation and competence.

Why it matters

Controls outsourced work.

Row 7

Scheme element

Record retention

What it should say

Which records are kept and for how long.

Why it matters

Supports audit and investigation.

Read the complete comparison table
Written control scheme contents
RowScheme elementWhat it should sayWhy it matters
1RolesWho does what and who reviews.Prevents orphaned tasks.
2Control parametersTemperature, treatment or other performance criteria.Defines what good looks like.
3Monitoring frequencyDaily, weekly, monthly, quarterly or annual tasks as appropriate.Keeps checks consistent.
4Action levelsWhat triggers repair, cleaning, restriction or escalation.Prevents passive logging.
5SchematicSystem layout and high-risk points.Helps find stagnation and dead legs.
6Contractor dutiesScope, reporting, escalation and competence.Controls outsourced work.
7Record retentionWhich records are kept and for how long.Supports audit and investigation.
Source comparison

Table ID: legionella-management-ericpd-five-level-control

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Column 1

Eliminate

Column 2

Elimination

Column 3

Remove unused outlets and dead legs where feasible, or remove an unnecessary aerosol-producing system.

Column 4

Water-system designer verifies drawings and commissioning; unidentified dead legs trigger survey and hold of affected use.

Row 2

Column 1

Reduce

Column 2

Substitution

Column 3

Replace a high-aerosol or stagnant arrangement with a lower-risk design where the service need permits.

Column 4

Dutyholder and designer compare service and scald needs; unassessed replacement is not commissioned.

Row 3

Column 1

Isolate / Control

Column 2

Engineering controls

Column 3

Maintain circulation and temperature or a validated alternative treatment, and contain aerosol at the source.

Column 4

Responsible person checks temperatures, treatment and equipment; loss of the defined barrier triggers access/use restrictions.

Row 4

Column 1

Control

Column 2

Administrative controls

Column 3

Map assets, flush low-use outlets as specified, clean/descale and record sentinel checks and corrective actions.

Column 4

Competent operator signs actual checks; a missing or failed check goes to the responsible person the same day.

Row 5

Column 1

PPE

Column 2

PPE

Column 3

For specialist cleaning, specify task-suitable protection for residual aerosol and treatment chemicals.

Column 4

Competent contractor checks the method and PPE; damaged kit or unplanned aerosol stops the task.

Row 6

Column 1

Discipline

Column 2

Sustaining all levels

Column 3

Audit records, trends and contractor work; review after system change, failed controls or suspected illness.

Column 4

Dutyholder samples evidence and closes defects; repeat failure prompts redesign and competent review.

Read the complete comparison table
Source comparison
RowColumn 1Column 2Column 3Column 4
1EliminateEliminationRemove unused outlets and dead legs where feasible, or remove an unnecessary aerosol-producing system.Water-system designer verifies drawings and commissioning; unidentified dead legs trigger survey and hold of affected use.
2ReduceSubstitutionReplace a high-aerosol or stagnant arrangement with a lower-risk design where the service need permits.Dutyholder and designer compare service and scald needs; unassessed replacement is not commissioned.
3Isolate / ControlEngineering controlsMaintain circulation and temperature or a validated alternative treatment, and contain aerosol at the source.Responsible person checks temperatures, treatment and equipment; loss of the defined barrier triggers access/use restrictions.
4ControlAdministrative controlsMap assets, flush low-use outlets as specified, clean/descale and record sentinel checks and corrective actions.Competent operator signs actual checks; a missing or failed check goes to the responsible person the same day.
5PPEPPEFor specialist cleaning, specify task-suitable protection for residual aerosol and treatment chemicals.Competent contractor checks the method and PPE; damaged kit or unplanned aerosol stops the task.
6DisciplineSustaining all levelsAudit records, trends and contractor work; review after system change, failed controls or suspected illness.Dutyholder samples evidence and closes defects; repeat failure prompts redesign and competent review.
Hot and cold water control scheme worked example

Table ID: legionella-management-hot-and-cold-water-control-scheme-worked-example

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Control scheme element

System schematic

Example arrangement

Current drawing shows incoming main, storage, calorifiers, hot return, TMVs, showers, kitchens, little-used outlets and dead legs.

Review evidence

Schematic version control and change notes.

Row 2

Control scheme element

Responsible roles

Example arrangement

Dutyholder appoints responsible person, deputy, facilities technician and contractor contact with escalation routes.

Review evidence

Appointment letters, competence records and contact list.

Row 3

Control scheme element

Hot water control

Example arrangement

Calorifier, return and sentinel outlets checked to confirm hot water control remains effective.

Review evidence

Temperature log, exceptions and repair records.

Row 4

Control scheme element

Cold water control

Example arrangement

Tanks, sentinel outlets and storage are monitored to confirm cold water is not warming into the risk range.

Review evidence

Cold-water temperature log and trend review.

Row 5

Control scheme element

Little-used outlets

Example arrangement

Mapped outlets are flushed safely on a defined frequency or removed if no longer needed.

Review evidence

Flushing register, missed-flush report and removal plan.

Row 6

Control scheme element

Showers and spray points

Example arrangement

Shower heads and hoses are cleaned/descaled; defective hoses are replaced and rechecked.

Review evidence

Cleaning schedule and defect close-out.

Row 7

Control scheme element

Contractor role

Example arrangement

Contractor samples, inspects, treats or advises within a written scope and reports urgent failures promptly.

Review evidence

Contract report, recommendation tracker and dutyholder review.

Row 8

Control scheme element

Actions and review

Example arrangement

Out-of-range results, positive samples, refurbishment, closure/reopening or illness concerns trigger risk review.

Review evidence

Action tracker, revised assessment and management review notes.

Read the complete comparison table
Hot and cold water control scheme worked example
RowControl scheme elementExample arrangementReview evidence
1System schematicCurrent drawing shows incoming main, storage, calorifiers, hot return, TMVs, showers, kitchens, little-used outlets and dead legs.Schematic version control and change notes.
2Responsible rolesDutyholder appoints responsible person, deputy, facilities technician and contractor contact with escalation routes.Appointment letters, competence records and contact list.
3Hot water controlCalorifier, return and sentinel outlets checked to confirm hot water control remains effective.Temperature log, exceptions and repair records.
4Cold water controlTanks, sentinel outlets and storage are monitored to confirm cold water is not warming into the risk range.Cold-water temperature log and trend review.
5Little-used outletsMapped outlets are flushed safely on a defined frequency or removed if no longer needed.Flushing register, missed-flush report and removal plan.
6Showers and spray pointsShower heads and hoses are cleaned/descaled; defective hoses are replaced and rechecked.Cleaning schedule and defect close-out.
7Contractor roleContractor samples, inspects, treats or advises within a written scope and reports urgent failures promptly.Contract report, recommendation tracker and dutyholder review.
8Actions and reviewOut-of-range results, positive samples, refurbishment, closure/reopening or illness concerns trigger risk review.Action tracker, revised assessment and management review notes.
Source comparison

Table ID: legionella-management-hot-cold-decision

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Column 1

Cold storage/distribution

Column 2

Below 20°C where possible.

Column 3

Find heat gain or stagnation, apply interim measures and retest.

Column 4

HSE hot and cold systems

Row 2

Column 1

Hot storage

Column 2

At least 60°C.

Column 3

Check heater, stratification and circulation; assess exposure before continued use.

Column 4

HSE hot and cold systems

Row 3

Column 1

Hot outlet

Column 2

At least 50°C in one minute; 55°C in healthcare.

Column 3

Check location, mixing valve, circulation and scald control; repair and retest.

Column 4

HSE hot and cold systems

Read the complete comparison table
Source comparison
RowColumn 1Column 2Column 3Column 4
1Cold storage/distributionBelow 20°C where possible.Find heat gain or stagnation, apply interim measures and retest.HSE hot and cold systems
2Hot storageAt least 60°C.Check heater, stratification and circulation; assess exposure before continued use.HSE hot and cold systems
3Hot outletAt least 50°C in one minute; 55°C in healthcare.Check location, mixing valve, circulation and scald control; repair and retest.HSE hot and cold systems
Monitoring and sampling evidence

Table ID: legionella-management-monitoring-and-sampling-evidence

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Activity

Temperature monitoring

What it checks

Hot/cold control remains effective.

Evidence standard

Recorded location, result, time and action.

Row 2

Activity

Flushing

What it checks

Little-used outlets do not stagnate.

Evidence standard

Schedule, completion and exceptions.

Row 3

Activity

Treatment checks

What it checks

Biocide or treatment remains within target.

Evidence standard

Result, correction and trend.

Row 4

Activity

Inspection

What it checks

Tanks, scale, corrosion, biofilm or poor condition.

Evidence standard

Inspection report and photos.

Row 5

Activity

Sampling

What it checks

Microbiological status where risk indicates.

Evidence standard

Competent sampling plan and interpretation.

Row 6

Activity

Action tracking

What it checks

Defects are fixed and verified.

Evidence standard

Owner, date, completion and recheck.

Read the complete comparison table
Monitoring and sampling evidence
RowActivityWhat it checksEvidence standard
1Temperature monitoringHot/cold control remains effective.Recorded location, result, time and action.
2FlushingLittle-used outlets do not stagnate.Schedule, completion and exceptions.
3Treatment checksBiocide or treatment remains within target.Result, correction and trend.
4InspectionTanks, scale, corrosion, biofilm or poor condition.Inspection report and photos.
5SamplingMicrobiological status where risk indicates.Competent sampling plan and interpretation.
6Action trackingDefects are fixed and verified.Owner, date, completion and recheck.
Cleaning and flushing controls

Table ID: legionella-management-cleaning-and-flushing-controls

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Control

Little-used outlet flushing

Good practice

Defined frequency, safe method and record.

Common failure

Ticked off without actually flushing.

Row 2

Control

Shower cleaning

Good practice

Clean and descale heads and hoses.

Common failure

Blocked or scaled outlets left in use.

Row 3

Control

Tank inspection

Good practice

Check cleanliness, covers, insulation and debris.

Common failure

Tank not accessible or never inspected.

Row 4

Control

Dead leg removal

Good practice

Remove or redesign redundant pipework.

Common failure

Permanent flushing used as a weak workaround.

Row 5

Control

Disinfection

Good practice

Competent chemical/thermal disinfection where required.

Common failure

Treatment done but cause not fixed.

Row 6

Control

Post-work verification

Good practice

Confirm control restored after cleaning or modification.

Common failure

No recheck or record.

Read the complete comparison table
Cleaning and flushing controls
RowControlGood practiceCommon failure
1Little-used outlet flushingDefined frequency, safe method and record.Ticked off without actually flushing.
2Shower cleaningClean and descale heads and hoses.Blocked or scaled outlets left in use.
3Tank inspectionCheck cleanliness, covers, insulation and debris.Tank not accessible or never inspected.
4Dead leg removalRemove or redesign redundant pipework.Permanent flushing used as a weak workaround.
5DisinfectionCompetent chemical/thermal disinfection where required.Treatment done but cause not fixed.
6Post-work verificationConfirm control restored after cleaning or modification.No recheck or record.
Contractor management checks

Table ID: legionella-management-contractor-management-checks

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Check

Competence

What good looks like

Relevant experience, training and clear technical support.

Warning sign

Only price used for selection.

Row 2

Check

Scope

What good looks like

Written scope covers system, frequencies and reporting.

Warning sign

Assumptions about who does flushing or actions.

Row 3

Check

Reports

What good looks like

Findings are clear, prioritised and explained.

Warning sign

Long reports with no action summary.

Row 4

Check

Escalation

What good looks like

Failures trigger prompt dutyholder action.

Warning sign

Defects remain open without risk review.

Row 5

Check

Verification

What good looks like

Repairs or cleaning are rechecked.

Warning sign

Invoices accepted as proof of control.

Row 6

Check

Change control

What good looks like

System changes are communicated.

Warning sign

Contractor unaware of refurbishment or closure.

Read the complete comparison table
Contractor management checks
RowCheckWhat good looks likeWarning sign
1CompetenceRelevant experience, training and clear technical support.Only price used for selection.
2ScopeWritten scope covers system, frequencies and reporting.Assumptions about who does flushing or actions.
3ReportsFindings are clear, prioritised and explained.Long reports with no action summary.
4EscalationFailures trigger prompt dutyholder action.Defects remain open without risk review.
5VerificationRepairs or cleaning are rechecked.Invoices accepted as proof of control.
6Change controlSystem changes are communicated.Contractor unaware of refurbishment or closure.
Legionella records

Table ID: legionella-management-legionella-records

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Record

Risk assessment

What it should show

System risk, people at risk and control strategy.

Review point

Review after change or poor results.

Row 2

Record

Responsible person appointment

What it should show

Named competent person and deputies.

Review point

Review after role changes.

Row 3

Record

Schematic

What it should show

Current water-system layout.

Review point

Update after modifications.

Row 4

Record

Written control scheme

What it should show

Controls, frequencies, action levels and escalation.

Review point

Use a risk-based review programme and earlier change/failure triggers; an annual review is an example planned interval, not a universal statutory expiry.

Row 5

Record

Temperature/treatment logs

What it should show

Monitoring completed and acted on.

Review point

Trend and exceptions.

Row 6

Record

Flushing records

What it should show

Little-used outlets managed.

Review point

Missed flushes and outlet use.

Row 7

Record

Cleaning/disinfection records

What it should show

Work completed by competent people.

Review point

Post-work verification.

Row 8

Record

Action tracker

What it should show

Defects closed and verified.

Review point

Overdue high-risk actions.

Read the complete comparison table
Legionella records
RowRecordWhat it should showReview point
1Risk assessmentSystem risk, people at risk and control strategy.Review after change or poor results.
2Responsible person appointmentNamed competent person and deputies.Review after role changes.
3SchematicCurrent water-system layout.Update after modifications.
4Written control schemeControls, frequencies, action levels and escalation.Use a risk-based review programme and earlier change/failure triggers; an annual review is an example planned interval, not a universal statutory expiry.
5Temperature/treatment logsMonitoring completed and acted on.Trend and exceptions.
6Flushing recordsLittle-used outlets managed.Missed flushes and outlet use.
7Cleaning/disinfection recordsWork completed by competent people.Post-work verification.
8Action trackerDefects closed and verified.Overdue high-risk actions.
Source comparison

Table ID: legionella-management-water-exception-analysis-checks

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html Scope: Original SHARE decision prompts informed by these official sources; HSE legal guidance applies to Great Britain unless a source explicitly states wider technical scope.

Row 1

Exception

Repeated slow hot-water response

What to establish

Correct test point, method, circulation and changes in use; separate scald control.

Closure evidence

Competent diagnosis, completed repair and confirming checks at affected points. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .

Row 2

Exception

Missing outlet from the schematic

What to establish

Survey actual pipework and establish whether a redundant branch remains.

Closure evidence

Updated drawing and assessed removal or control of the actual branch. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .

Row 3

Exception

Normal remote log, abnormal local check

What to establish

Sensor position, coverage, calibration and comparability of readings.

Closure evidence

Validated monitoring coverage and resolved local control weakness. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .

Row 4

Exception

Missed low-use outlet task

What to establish

Actual use, missed period and possible exposure; do not backdate a tick.

Closure evidence

Risk decision, completed appropriate work and a resourced future schedule. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .

Read the complete comparison table
Source comparison
RowExceptionWhat to establishClosure evidence
1Repeated slow hot-water responseCorrect test point, method, circulation and changes in use; separate scald control.Competent diagnosis, completed repair and confirming checks at affected points. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .
2Missing outlet from the schematicSurvey actual pipework and establish whether a redundant branch remains.Updated drawing and assessed removal or control of the actual branch. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .
3Normal remote log, abnormal local checkSensor position, coverage, calibration and comparability of readings.Validated monitoring coverage and resolved local control weakness. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .
4Missed low-use outlet taskActual use, missed period and possible exposure; do not backdate a tick.Risk decision, completed appropriate work and a resourced future schedule. Related guidance: Hot and cold water systems ; Keeping legionella records ; HSG274 technical guidance .
Legionella response triggers

Table ID: legionella-management-legionella-response-triggers

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Trigger

Temperature out of range

Immediate management action

Assess risk, restrict use if needed and arrange repair.

Follow up

Recheck and trend review.

Row 2

Trigger

Positive sample

Immediate management action

Follow competent advice, consider restriction, clean/disinfect and investigate cause.

Follow up

Review control scheme.

Row 3

Trigger

Missed monitoring

Immediate management action

Complete overdue checks and assess exposure risk.

Follow up

Review resources and accountability.

Row 4

Trigger

Suspected illness linked to premises

Immediate management action

Escalate, preserve records and cooperate with health/public authorities.

Follow up

Investigate controls and update scheme.

Row 5

Trigger

System change/refurbishment

Immediate management action

Review risk assessment before use.

Follow up

Update schematic and control programme.

Row 6

Trigger

Long building closure

Immediate management action

Implement recommissioning/flushing plan before reoccupation.

Follow up

Verify controls before normal use.

Read the complete comparison table
Legionella response triggers
RowTriggerImmediate management actionFollow up
1Temperature out of rangeAssess risk, restrict use if needed and arrange repair.Recheck and trend review.
2Positive sampleFollow competent advice, consider restriction, clean/disinfect and investigate cause.Review control scheme.
3Missed monitoringComplete overdue checks and assess exposure risk.Review resources and accountability.
4Suspected illness linked to premisesEscalate, preserve records and cooperate with health/public authorities.Investigate controls and update scheme.
5System change/refurbishmentReview risk assessment before use.Update schematic and control programme.
6Long building closureImplement recommissioning/flushing plan before reoccupation.Verify controls before normal use.
Sector examples

Table ID: legionella-management-sector-examples

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Setting

Office

Typical risk

Little-used showers, kitchenettes and stored water.

Management focus

Simple schematic, flushing, temperatures and contractor review.

Row 2

Setting

Hotel/leisure

Typical risk

Showers, pools, spas and changing facilities.

Management focus

High-use/high-aerosol controls and occupancy changes.

Row 3

Setting

Care setting

Typical risk

Susceptible users and scald risk.

Management focus

Competent balancing of scald and legionella controls.

Row 4

Setting

Construction/refurbishment

Typical risk

Temporary water, recommissioning and disturbed systems.

Management focus

Pre-use controls and handover evidence.

Row 5

Setting

Manufacturing

Typical risk

Process water, washers, cooling and aerosols.

Management focus

System-specific assessment and maintenance.

Row 6

Setting

Vacant property

Typical risk

Stagnation and unknown system condition.

Management focus

Recommissioning before occupation.

Row 7

Setting

Metalworking

Typical risk

Water-mix fluids and aerosol during cleaning or jetting.

Management focus

Fluid management and avoid aerosolising biofilm.

Read the complete comparison table
Sector examples
RowSettingTypical riskManagement focus
1OfficeLittle-used showers, kitchenettes and stored water.Simple schematic, flushing, temperatures and contractor review.
2Hotel/leisureShowers, pools, spas and changing facilities.High-use/high-aerosol controls and occupancy changes.
3Care settingSusceptible users and scald risk.Competent balancing of scald and legionella controls.
4Construction/refurbishmentTemporary water, recommissioning and disturbed systems.Pre-use controls and handover evidence.
5ManufacturingProcess water, washers, cooling and aerosols.System-specific assessment and maintenance.
6Vacant propertyStagnation and unknown system condition.Recommissioning before occupation.
7MetalworkingWater-mix fluids and aerosol during cleaning or jetting.Fluid management and avoid aerosolising biofilm.
Source tables and records 2
Riverside Leisure Ltd worked example

Table ID: legionella-management-riverside-leisure-ltd-worked-example

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Management element

Assessing

How the business would manage it

Riverside maps showers, spa features, tanks, calorifiers, little-used outlets and vulnerable users.

Evidence to review

Risk assessment and schematic. HSE L8

Row 2

Management element

Analysing

How the business would manage it

Temperature trends, missed flushing, contractor reports and repairs are reviewed monthly.

Evidence to review

Dashboard and exception report. HSE L8

Row 3

Management element

Implementing

How the business would manage it

A written scheme defines monitoring, cleaning, sampling, action levels and escalation.

Evidence to review

Control scheme and task logs. HSE L8

Row 4

Management element

Training

How the business would manage it

Facilities staff and duty managers learn what to check, when to restrict use and how to escalate.

Evidence to review

Training matrix and briefings. HSE L8

Row 5

Management element

Checking

How the business would manage it

Second-line audits sample outlet records, plant condition, contractor actions and recheck evidence.

Evidence to review

Audit report and action tracker. HSE L8

Row 6

Management element

Learning

How the business would manage it

Poor results or refurbishment changes trigger scheme review and user communication.

Evidence to review

Review notes and updated schematic. HSE L8

Read the complete comparison table
Riverside Leisure Ltd worked example
RowManagement elementHow the business would manage itEvidence to review
1AssessingRiverside maps showers, spa features, tanks, calorifiers, little-used outlets and vulnerable users.Risk assessment and schematic. HSE L8
2AnalysingTemperature trends, missed flushing, contractor reports and repairs are reviewed monthly.Dashboard and exception report. HSE L8
3ImplementingA written scheme defines monitoring, cleaning, sampling, action levels and escalation.Control scheme and task logs. HSE L8
4TrainingFacilities staff and duty managers learn what to check, when to restrict use and how to escalate.Training matrix and briefings. HSE L8
5CheckingSecond-line audits sample outlet records, plant condition, contractor actions and recheck evidence.Audit report and action tracker. HSE L8
6LearningPoor results or refurbishment changes trigger scheme review and user communication.Review notes and updated schematic. HSE L8
Source comparison

Table ID: legionella-management-observed-role-assessment-checks

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html Scope: Original SHARE assessment examples informed by official guidance. These are suggested observations, not mandatory course syllabuses or statutory certificates.

Row 1

Role and assessor

Building user/worker — facilities supervisor

Observed decision

Recognise an out-of-service outlet, respect restrictions and report unexpected condition to the named contact.

Limits and failure response

Do not flush, remove signs or change valve settings without authorised instruction.

Record and reassessment

Briefing and demonstrated reporting route; refresh after changed access or restrictions. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .

Row 2

Role and assessor

Facilities technician — assessor competent in the system/method

Observed decision

Locate the point on the schematic, take the specified measurement, record time/result and escalate a simulated exception.

Limits and failure response

Remain within the instructed task; an uncertain point or failed instrument holds the measurement decision.

Record and reassessment

Observed point/method and exception response; reassess after instrument, pipework or method change. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .

Row 3

Role and assessor

Responsible person/deputy — competent water-safety assessor

Observed decision

Interpret evidence, decide affected restrictions, obtain specialist support and set a verified release condition.

Limits and failure response

Do not treat a negative sample or contractor invoice as proof that all controls work.

Record and reassessment

System-specific decision, cover and recovery evidence; reassess after altered use, failed controls or loss of authority. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .

Row 4

Role and assessor

Contractor/specialist — competent technical reviewer

Observed decision

Explain survey/test/treatment scope, limitations, records and hand-back against the system-specific scheme.

Limits and failure response

Do not apply domestic benchmarks to cooling or spa systems; resolve unclear acceptance criteria before work.

Record and reassessment

Scope, demonstrated methods, interpreted results and exclusions; review changed plant or contracted duty. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .

Row 5

Role and assessor

Dutyholder/manager — competent governance reviewer

Observed decision

Test whether competent cover, access, budget and an open-exception route exist in practice.

Limits and failure response

Cannot delegate away the duty or authorise unsafe exposure because a reopening date is fixed.

Record and reassessment

Resourcing and sampled exception closure; reassess after organisational change or recurring failures. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .

Read the complete comparison table
Source comparison
RowRole and assessorObserved decisionLimits and failure responseRecord and reassessment
1Building user/worker — facilities supervisorRecognise an out-of-service outlet, respect restrictions and report unexpected condition to the named contact.Do not flush, remove signs or change valve settings without authorised instruction.Briefing and demonstrated reporting route; refresh after changed access or restrictions. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .
2Facilities technician — assessor competent in the system/methodLocate the point on the schematic, take the specified measurement, record time/result and escalate a simulated exception.Remain within the instructed task; an uncertain point or failed instrument holds the measurement decision.Observed point/method and exception response; reassess after instrument, pipework or method change. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .
3Responsible person/deputy — competent water-safety assessorInterpret evidence, decide affected restrictions, obtain specialist support and set a verified release condition.Do not treat a negative sample or contractor invoice as proof that all controls work.System-specific decision, cover and recovery evidence; reassess after altered use, failed controls or loss of authority. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .
4Contractor/specialist — competent technical reviewerExplain survey/test/treatment scope, limitations, records and hand-back against the system-specific scheme.Do not apply domestic benchmarks to cooling or spa systems; resolve unclear acceptance criteria before work.Scope, demonstrated methods, interpreted results and exclusions; review changed plant or contracted duty. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .
5Dutyholder/manager — competent governance reviewerTest whether competent cover, access, budget and an open-exception route exist in practice.Cannot delegate away the duty or authorise unsafe exposure because a reopening date is fixed.Resourcing and sampled exception closure; reassess after organisational change or recurring failures. Related guidance: L8 ACOP and guidance ; HSG274 technical guidance ; Keeping legionella records .
Training levels

Table ID: legionella-management-training-levels

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Training level

General awareness

Who needs it

Everyone who may encounter the topic.

What it should cover

Plain-English awareness of legionella management, why it matters, common situations, basic controls, reporting routes and where to get help. HSE L8

Row 2

Training level

Topical practical training

Who needs it

Workers most directly involved in the task or support process.

What it should cover

Task examples, control expectations, warning signs, stop-work points, escalation and records. HSE L8

Row 3

Training level

Supervisor and manager training

Who needs it

People allocating work, authorising tasks, holding conversations or checking controls.

What it should cover

Decision quality, private conversations, supervision, risk assessment, evidence, escalation and review. HSE L8

Row 4

Training level

Specialist or competent-person training

Who needs it

Dutyholders, responsible persons, deputies, facilities teams, maintenance contractors, leisure managers, landlords, property managers and auditors.

What it should cover

Technical assessment, occupational health, fire safety, process safety, auditing, investigation or legal/privacy support where needed. HSE L8

Row 5

Training level

Refresher and learning

Who needs it

People in roles where drift, rare tasks or changing work creates risk.

What it should cover

Scenario refreshers, incident learning, audit findings, drills, reassessment and updates after change. HSE L8

Read the complete comparison table
Training levels
RowTraining levelWho needs itWhat it should cover
1General awarenessEveryone who may encounter the topic.Plain-English awareness of legionella management, why it matters, common situations, basic controls, reporting routes and where to get help. HSE L8
2Topical practical trainingWorkers most directly involved in the task or support process.Task examples, control expectations, warning signs, stop-work points, escalation and records. HSE L8
3Supervisor and manager trainingPeople allocating work, authorising tasks, holding conversations or checking controls.Decision quality, private conversations, supervision, risk assessment, evidence, escalation and review. HSE L8
4Specialist or competent-person trainingDutyholders, responsible persons, deputies, facilities teams, maintenance contractors, leisure managers, landlords, property managers and auditors.Technical assessment, occupational health, fire safety, process safety, auditing, investigation or legal/privacy support where needed. HSE L8
5Refresher and learningPeople in roles where drift, rare tasks or changing work creates risk.Scenario refreshers, incident learning, audit findings, drills, reassessment and updates after change. HSE L8
Learner prompts

Table ID: legionella-management-learner-prompts

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Prompt

Explain how legionella risk arises.

Strong answer should include

Growth in water systems plus aerosol exposure and susceptible people.

Weak answer

Dirty water causes disease.

Row 2

Prompt

Explain L8/HSG274 control.

Strong answer should include

Assess, appoint responsibility, written scheme, monitor, record and review.

Weak answer

Take water samples.

Row 3

Prompt

Explain temperature control.

Strong answer should include

Keep cold water cold, hot water hot and act on out-of-range readings.

Weak answer

Check temperatures sometimes.

Row 4

Prompt

Explain records.

Strong answer should include

Risk assessment, schematic, scheme, logs, actions, contractor reports and review.

Weak answer

Keep a folder.

Row 5

Prompt

Explain contractor duties.

Strong answer should include

Outsourcing support does not remove dutyholder control.

Weak answer

Contractor handles it all.

Read the complete comparison table
Learner prompts
RowPromptStrong answer should includeWeak answer
1Explain how legionella risk arises.Growth in water systems plus aerosol exposure and susceptible people.Dirty water causes disease.
2Explain L8/HSG274 control.Assess, appoint responsibility, written scheme, monitor, record and review.Take water samples.
3Explain temperature control.Keep cold water cold, hot water hot and act on out-of-range readings.Check temperatures sometimes.
4Explain records.Risk assessment, schematic, scheme, logs, actions, contractor reports and review.Keep a folder.
5Explain contractor duties.Outsourcing support does not remove dutyholder control.Contractor handles it all.
Source comparison

Table ID: legionella-management-gb-ni-law

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Column 1

Great Britain

Column 2

Health and Safety at Work etc. Act 1974

Column 3

General employer, worker and public protection duties.

Row 2

Column 1

Northern Ireland

Column 2

Health and Safety at Work (NI) Order 1978

Column 3

The separate NI general-duty route.

Row 3

Column 1

Great Britain

Column 2

Management of Health and Safety at Work Regulations 1999

Column 3

Risk assessment, arrangements, competence and emergency planning.

Row 4

Column 1

Northern Ireland

Column 2

Management of Health and Safety at Work Regulations (NI) 2000

Column 3

The separate NI management and risk-assessment route.

Row 5

Column 1

Great Britain

Column 2

COSHH Regulations 2002

Column 3

Biological-agent exposure assessment and control.

Row 6

Column 1

Northern Ireland

Column 2

COSHH Regulations (NI) 2003

Column 3

Separate NI biological-agent exposure controls.

Row 7

Column 1

Great Britain

Column 2

L8, fourth edition ACOP and guidance

Column 3

GB approved-code route for legionella risk.

Row 8

Column 1

Northern Ireland

Column 2

HSENI approval of L8 for use in NI

Column 3

L8 is approved for use with NI law.

Read the complete comparison table
Source comparison
RowColumn 1Column 2Column 3
1Great BritainHealth and Safety at Work etc. Act 1974General employer, worker and public protection duties.
2Northern IrelandHealth and Safety at Work (NI) Order 1978The separate NI general-duty route.
3Great BritainManagement of Health and Safety at Work Regulations 1999Risk assessment, arrangements, competence and emergency planning.
4Northern IrelandManagement of Health and Safety at Work Regulations (NI) 2000The separate NI management and risk-assessment route.
5Great BritainCOSHH Regulations 2002Biological-agent exposure assessment and control.
6Northern IrelandCOSHH Regulations (NI) 2003Separate NI biological-agent exposure controls.
7Great BritainL8, fourth edition ACOP and guidanceGB approved-code route for legionella risk.
8Northern IrelandHSENI approval of L8 for use in NIL8 is approved for use with NI law.
Warning signs and actions

Table ID: legionella-management-warning-signs-and-actions

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Warning sign

No named responsible person

How harm can develop

Controls may be nobody's job.

Action

Appoint competent owner and deputy. HSE L8

Row 2

Warning sign

Out-of-date schematic

How harm can develop

Dead legs or high-risk outlets may be missed.

Action

Update system information. HSE L8

Row 3

Warning sign

Repeated temperature failures

How harm can develop

Growth conditions may persist.

Action

Investigate root cause and repair. HSE L8

Row 4

Warning sign

Missed flushing

How harm can develop

Stagnant water may develop.

Action

Recover schedule and review outlet use. HSE L8

Row 5

Warning sign

Contractor reports unread

How harm can develop

Defects remain open.

Action

Review reports and action tracker. HSE L8

Row 6

Warning sign

No change review after refurbishment

How harm can develop

New risk may not be controlled.

Action

Review assessment before reoccupation. HSE L8

Row 7

Warning sign

No evidence of action after positive sample

How harm can develop

Control may not be restored.

Action

Escalate, clean/disinfect and verify. HSE L8

Read the complete comparison table
Warning signs and actions
RowWarning signHow harm can developAction
1No named responsible personControls may be nobody's job.Appoint competent owner and deputy. HSE L8
2Out-of-date schematicDead legs or high-risk outlets may be missed.Update system information. HSE L8
3Repeated temperature failuresGrowth conditions may persist.Investigate root cause and repair. HSE L8
4Missed flushingStagnant water may develop.Recover schedule and review outlet use. HSE L8
5Contractor reports unreadDefects remain open.Review reports and action tracker. HSE L8
6No change review after refurbishmentNew risk may not be controlled.Review assessment before reoccupation. HSE L8
7No evidence of action after positive sampleControl may not be restored.Escalate, clean/disinfect and verify. HSE L8
Related SHARE pages

Table ID: legionella-management-related-share-pages

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Related page

Biological Hazards

Why it helps

Biological-agent risk framing.

Row 2

Related page

COSHH Control Measures and Health Surveillance

Why it helps

Hazardous-substance control principles.

Row 3

Related page

Health Surveillance, Medical Records and Biological Monitoring

Why it helps

Health-record and OH boundaries.

Row 4

Related page

Hand Hygiene and Infection Prevention

Why it helps

Hygiene and infection prevention principles.

Row 5

Related page

Health, Welfare and Work Environment

Why it helps

Workplace welfare and facilities.

Row 6

Related page

Contractor Management in Process Industries

Why it helps

Contractor assurance principles.

Read the complete comparison table
Related SHARE pages
RowRelated pageWhy it helps
1Biological HazardsBiological-agent risk framing.
2COSHH Control Measures and Health SurveillanceHazardous-substance control principles.
3Health Surveillance, Medical Records and Biological MonitoringHealth-record and OH boundaries.
4Hand Hygiene and Infection PreventionHygiene and infection prevention principles.
5Health, Welfare and Work EnvironmentWorkplace welfare and facilities.
6Contractor Management in Process IndustriesContractor assurance principles.
Source comparison

Table ID: legionella-management-official-links

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Column 1

HSE

Column 2

L8 ACOP and guidance

Column 3

Great Britain

Column 4

Risk assessment, responsibility and written control scheme.

Row 2

Column 1

HSENI

Column 2

L8 approved for use in NI

Column 3

Northern Ireland

Column 4

L8 status and the separate NI statutory context.

Row 3

Column 1

HSE

Column 2

HSG274 technical guidance

Column 3

United Kingdom

Column 4

Part 1 cooling, Part 2 hot/cold and Part 3 other systems; 2024 update of Part 1 only.

Row 4

Column 1

HSE

Column 2

Hot and cold water systems

Column 3

Great Britain

Column 4

Temperature-control benchmarks and system differences.

Row 5

Column 1

HSE

Column 2

Keeping legionella records

Column 3

Great Britain

Column 4

Control scheme and monitoring-record retention.

Row 6

Column 1

HSENI

Column 2

Legionella in care-home water systems

Column 3

Northern Ireland

Column 4

NI care setting and vulnerable-user decisions.

Row 7

Column 1

UK legislation

Column 2

COSHH Regulations 2002

Column 3

Great Britain

Column 4

GB biological-agent control duty.

Row 8

Column 1

UK legislation

Column 2

COSHH Regulations (NI) 2003

Column 3

Northern Ireland

Column 4

NI biological-agent control duty.

Row 9

Column 1

HSE

Column 2

HSE: How to manage health and safety

Column 3

Great Britain

Column 4

Management planning, worker input, checking and action.

Row 10

Column 1

HSENI

Column 2

HSENI: Health and safety made simple

Column 3

Northern Ireland

Column 4

Competent management, risk control and review.

Row 11

Column 1

UK legislation

Column 2

Health and Safety at Work etc. Act 1974

Column 3

Great Britain

Column 4

General duty framework for the GB work activity.

Row 12

Column 1

UK legislation

Column 2

Health and Safety at Work (Northern Ireland) Order 1978

Column 3

Northern Ireland

Column 4

Separate NI general duty framework.

Row 13

Column 1

UK legislation

Column 2

Management of Health and Safety at Work Regulations 1999

Column 3

Great Britain

Column 4

GB risk assessment, arrangements and review.

Row 14

Column 1

UK legislation

Column 2

Management of Health and Safety at Work Regulations (Northern Ireland) 2000

Column 3

Northern Ireland

Column 4

NI risk assessment, arrangements and review.

Row 15

Column 1

HSE

Column 2

HSE: Identify and assess sources of risk

Column 3

Great Britain

Column 4

Competent assessment; low-risk/no-foreseeable-risk outcome, maintenance and review.

Row 16

Column 1

HSE

Column 2

HSE: ISO 45001 management standard

Column 3

Great Britain

Column 4

Voluntary management-system and certification boundaries; not product standards or exact clause verification.

Row 17

Column 1

www.hse.gov.uk

Column 2

HSE legionella other duties

Column 3

Great Britain

Column 4

Supports the page-specific decision and boundaries described above; verify the applicable task and service route.

Row 18

Column 1

www.nhs.uk

Column 2

NHS Legionnaires’ disease

Column 3

Clinical guidance; follow local UK services

Column 4

Supports the page-specific decision and boundaries described above; verify the applicable task and service route.

Read the complete comparison table
Source comparison
RowColumn 1Column 2Column 3Column 4
1HSEL8 ACOP and guidanceGreat BritainRisk assessment, responsibility and written control scheme.
2HSENIL8 approved for use in NINorthern IrelandL8 status and the separate NI statutory context.
3HSEHSG274 technical guidanceUnited KingdomPart 1 cooling, Part 2 hot/cold and Part 3 other systems; 2024 update of Part 1 only.
4HSEHot and cold water systemsGreat BritainTemperature-control benchmarks and system differences.
5HSEKeeping legionella recordsGreat BritainControl scheme and monitoring-record retention.
6HSENILegionella in care-home water systemsNorthern IrelandNI care setting and vulnerable-user decisions.
7UK legislationCOSHH Regulations 2002Great BritainGB biological-agent control duty.
8UK legislationCOSHH Regulations (NI) 2003Northern IrelandNI biological-agent control duty.
9HSEHSE: How to manage health and safetyGreat BritainManagement planning, worker input, checking and action.
10HSENIHSENI: Health and safety made simpleNorthern IrelandCompetent management, risk control and review.
11UK legislationHealth and Safety at Work etc. Act 1974Great BritainGeneral duty framework for the GB work activity.
12UK legislationHealth and Safety at Work (Northern Ireland) Order 1978Northern IrelandSeparate NI general duty framework.
13UK legislationManagement of Health and Safety at Work Regulations 1999Great BritainGB risk assessment, arrangements and review.
14UK legislationManagement of Health and Safety at Work Regulations (Northern Ireland) 2000Northern IrelandNI risk assessment, arrangements and review.
15HSEHSE: Identify and assess sources of riskGreat BritainCompetent assessment; low-risk/no-foreseeable-risk outcome, maintenance and review.
16HSEHSE: ISO 45001 management standardGreat BritainVoluntary management-system and certification boundaries; not product standards or exact clause verification.
17www.hse.gov.ukHSE legionella other dutiesGreat BritainSupports the page-specific decision and boundaries described above; verify the applicable task and service route.
18www.nhs.ukNHS Legionnaires’ diseaseClinical guidance; follow local UK servicesSupports the page-specific decision and boundaries described above; verify the applicable task and service route.
Source comparison

Table ID: legionella-management-terms

Source: https://www.sharehub.ltd/knowledge-hub/legionella-management.html

Row 1

Column 1

GB

Column 2

Great Britain

Column 3

England, Scotland and Wales legal route.

Row 2

Column 1

NI

Column 2

Northern Ireland

Column 3

Separate law; HSENI approves L8 for use.

Row 3

Column 1

L8

Column 2

Legionnaires’ disease approved code and guidance

Column 3

Dutyholder control framework.

Row 4

Column 1

HSG274

Column 2

HSE legionella technical guidance, three parts

Column 3

Choose the part for the actual water system.

Row 5

Column 1

COSHH

Column 2

Control of Substances Hazardous to Health

Column 3

Biological-agent exposure law in separate GB and NI instruments.

Row 6

Column 1

TMV

Column 2

Thermostatic mixing valve

Column 3

Balances scald control with legionella system design and checks.

Row 7

Column 1

ERICPD

Column 2

Eliminate, Reduce, Isolate, Control, PPE, Discipline

Column 3

Control planning and sustained checks.

Row 8

Column 1

Sentinel outlet

Column 2

Selected representative hot/cold outlet

Column 3

A point for temperature monitoring under the scheme.

Row 9

Column 1

ACOP

Column 2

Approved Code of Practice

Column 3

Different legal status from ordinary guidance; apply the appropriate GB/NI approval route.

Row 10

Column 1

PPE

Column 2

Personal protective equipment

Column 3

Selected for the maintenance or treatment task after assessment.

Row 11

Column 1

HSE

Column 2

Health and Safety Executive

Column 3

Great Britain regulator; HSG274 explicitly has UK technical scope.

Read the complete comparison table
Source comparison
RowColumn 1Column 2Column 3
1GBGreat BritainEngland, Scotland and Wales legal route.
2NINorthern IrelandSeparate law; HSENI approves L8 for use.
3L8Legionnaires’ disease approved code and guidanceDutyholder control framework.
4HSG274HSE legionella technical guidance, three partsChoose the part for the actual water system.
5COSHHControl of Substances Hazardous to HealthBiological-agent exposure law in separate GB and NI instruments.
6TMVThermostatic mixing valveBalances scald control with legionella system design and checks.
7ERICPDEliminate, Reduce, Isolate, Control, PPE, DisciplineControl planning and sustained checks.
8Sentinel outletSelected representative hot/cold outletA point for temperature monitoring under the scheme.
9ACOPApproved Code of PracticeDifferent legal status from ordinary guidance; apply the appropriate GB/NI approval route.
10PPEPersonal protective equipmentSelected for the maintenance or treatment task after assessment.
11HSEHealth and Safety ExecutiveGreat Britain regulator; HSG274 explicitly has UK technical scope.