Risk assessment project submission checklist
Project MS 5.0 preparation prompts. Your provider’s current instructions govern.
- Agree a real work area/task, safe observation arrangements, form and deadline.
- Observe work, consult the team, check relevant information and act on immediate danger.
- Select four significant inadequately controlled hazards; identify relevant people and how harm occurs.
- Record actual existing controls and justify current L, C and R.
- Choose specific stronger measures, conditional residual ratings, accountable owners and dated actions.
- Check the logical chain across every row. Do not manipulate ratings or treat proposals as installed controls.
- Complete opening details, review date, accepted signature and actual provider name.
- Save, close and reopen the final file; check every page and cell. Submit through the provider’s route and retain receipt.
38 project marks: 1 opening + 4 × 9 row elements + 1 closing. Project pass threshold 23/38. Self-review does not award a mark.