Approved safety critical suppliers and spares register

CWF-REG-PROC-01 · Blank register with separate fictional worked entries · Owner role: Engineering and asset integrity manager

Fictional arrangement or blank working master. No actual approval, site authorisation or completed evidence is supplied.

This preview shows saved worksheet values. Edit the downloaded workbook to use its formulas, filters and validation.

Register

Approved safety critical suppliers and spares register
Crownway Fuels Ltd. CWF-REG-PROC-01. Version 1.0. Blank working master. Enter actual facts and evidence.
OwnerEngineering and asset integrity managerAs at date
Records0Rows with alerts0
Editable A:H. Calculated I lists missing fields, invalid dates/status, duplicate IDs and passed review dates. A clear alert cell does not verify a control or authorise work.
Record required detail in column C: Scope; Assessed capability; Specification; Substitution restrictions and performance history
Read Guide before use. Set a valid As at date. Twenty rows are available; the default blank print view shows six. Keep stable IDs and evidence together when sorting.
Record IDActual site asset and subjectRequired technical or decision detailsDecision restriction and actionEvidence reference and ownerReview dueAction statusVerification evidence and limitsRecord alerts
Keep the actual retention rule and access class with the evidence. Preserve statutory minima, permit conditions and legal holds. Extend the table, formulas, validation, summaries and print area together and test the new last row.
SHARE homeGuide and worked examples are separate from real records. Save your own operational copy before entering data.

Worked examples

Approved safety critical suppliers and spares register
Crownway Fuels Ltd. CWF-REG-PROC-01. Version 1.0. Fictional examples. No operational evidence.
OwnerEngineering and asset integrity manager2026-11-10 00:00:00As at date
Records2Rows with alerts2
Editable A:H. Calculated I lists missing fields, invalid dates/status, duplicate IDs and passed review dates. A clear alert cell does not verify a control or authorise work.
Record required detail in column C: Scope; Assessed capability; Specification; Substitution restrictions and performance history
Read Guide before use. Set a valid As at date. Twenty rows are available; the default blank print view shows six. Keep stable IDs and evidence together when sorting.
Record IDActual site asset and subjectRequired technical or decision detailsDecision restriction and actionEvidence reference and ownerReview dueAction statusVerification evidence and limitsRecord alerts
EX-PROC-01Illustrative Approved safety critical suppliers and spares registerHold. Actual details and evidence not established.Engineering and asset integrity manager; invented reference EX-012026-11-17 00:00:00OpenMissing C;
EX-PROC-02Second illustrative decisionScope; Assessed capability; Specification; Substitution restrictions and performance historyImplemented change awaiting review; no release asserted.Engineering and asset integrity manager; invented reference EX-022026-11-09 00:00:00ImplementedEffectiveness remains unverified.Review date passed;
Keep the actual retention rule and access class with the evidence. Preserve statutory minima, permit conditions and legal holds. Extend the table, formulas, validation, summaries and print area together and test the new last row.
SHARE homeGuide and worked examples are separate from real records. Save your own operational copy before entering data.

Guide

Approved safety critical suppliers and spares register guide
PurposeProvide the site/task-specific approved safety critical suppliers and spares register and retain its controlled output.
ScopeBULK; HQ; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
ResponsibilityEngineering and asset integrity manager maintains current entries, unresolved restrictions and supporting evidence. No named person is appointed by this example.
Required detailsScope; Assessed capability; Specification; Substitution restrictions and performance history
How to useRegister is blank. Worked examples contains two invented open records, including missing details and a passed review date. Complete actual A:H inputs and retain the detailed technical record separately.
Preparing the activitySpecify the actual safety function, compatibility, design, environmental and legal requirements before ordering equipment, spares or services. Include lifecycle maintenance, information and competence needs.
Operating arrangementEvaluate suppliers against the proposed scope and check changes or substitutions before acceptance. Retain certificates and instructions linked to the actual asset and review restrictions, rather than accepting a general supplier badge.
VerificationOn receipt, engineering checks identity and suitability before installation. Record defects and feedback, quarantine suspect items and examine whether similar supplies at other sites are affected.
Worked decisionA low-cost hose is offered as an equivalent spare without evidence for the fuel and operating conditions. Procurement holds purchase acceptance until engineering verifies suitability and required evidence. Commercial urgency does not remove the technical hold.
Stop and escalationQuarantine equipment/material with uncertain compatibility, missing essential conformity information, damaged condition or unapproved substitution before use.
Record alertsAlerts identify gaps A=ID, B=scope/subject, C=required detail, D=decision/action, E=evidence/owner, F=review due, G=status. Validity checks support record quality only. Human decisions and genuine evidence remain necessary.
Date controlsSet As at date on each working sheet. Dates must be numeric whole days from 1 to 73050. Text, zero, negatives and fractional dates remain invalid even if pasted. A passed review date prompts review; it is not an automatic legal expiry.
Status and verificationUse the exact categories below. Verified effective also needs a specific H entry describing the competent verifier, test, evidence and limits. A populated field or an empty alert cell does not prove those claims.
Keeping and extending recordsTwenty rows are prepared. To extend, enlarge the table and all bounded A10:A29 and I10:I29 summaries/duplicate ranges, copy formulas, validation and conditional formatting, update the print area and test the new last row. Keep IDs and evidence together when sorting.
Privacy and retentionSet the approved record-specific retention period before operational use, including applicable statutory minimum, permit conditions and legal holds; review is not permission to delete. Access class in the catalogue: Project team. Keep clinical and personal information in authorised restricted custody.
Primary guidance checked 10 November 2026. Legal and permission registers retain their own detailed review dates, territories and unresolved decisions.
Health and Safety Management Systems
Allowed action status values
OpenOfficial guidance 1 from www.hse.gov.uk
Implemented
Awaiting verification
Verified effective
Reopened
Not applicable