Crownway Fuels

SHAREhub · Company management system · v1.0

← All Crownway resources

Evacuation assistance and accountability plan

CWF-PLN-FIRE-01 · Completed fictional example · Owner role: Site manager and shift supervisor

Fictional arrangement or blank working master. No actual approval, site authorisation or completed evidence is supplied.

Evacuation assistance and accountability plan

Crownway Fuels Ltd. CWF-PLN-FIRE-01. Version 1.0. Prepared 10 November 2026.

COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.

Provide the site/task-specific evacuation assistance and accountability plan and retain its controlled output.

Purpose scope and accountable roles

BULK; HQ; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.

Site manager and shift supervisor owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.

Planned arrangements

The responsible person establishes the actual occupied-premises fire assessment, people at risk, escape and assistance arrangements, detection, warning and protective features. Coordinate the shop, forecourt, contractors and other occupiers.

Keep routes and exits usable, manage ignition and fuel, maintain applicable protection and address impairments promptly. Building work and temporary changes require review of compartmentation, escape and service interfaces.

Required planning outputs

Staff/public needs: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Accessible routes: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Muster: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Roll-call limitations and arrangements across shifts: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.

Delivery verification and review

Use competent risk-based inspection, maintenance and exercises and retain the applicable England fire-safety arrangements and evidence. Equipment checks support the assessment; an extinguisher service label does not establish overall fire safety.

StageExample management arrangement
Before the activityOwner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release.
At implementationSite supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment.
After change or failureSuspend the affected scope, assess the changed risk, update information and brief people before a new decision.
Planned reviewOwner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness.

Stop escalation and return

Close affected public/staff areas if essential escape routes, alarm coverage or other necessary life-safety measures are unavailable and safe alternative arrangements cannot be established.

The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.

Worked decision

An office door alteration could affect a protected escape route. The site manager holds the alteration pending competent fire and building review, agrees any interim restrictions and requires verified handback before the route is relied on.

This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.

Guidance and related arrangements

Primary guidance 1

Health and Safety Management Systems

Crownway document overview

Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.

Primary references: workplace fire safety your responsibilities

Related resources

Primary guidance