CWF-PLN-CONF-01 · Completed fictional example · Owner role: Engineering and asset integrity manager
Site specific confined space rescue plan
Crownway Fuels Ltd. CWF-PLN-CONF-01. Version 1.0. Prepared 10 November 2026.
COMPLETED FICTIONAL ARRANGEMENT. This Crownway example supports adaptation and learning. It represents no actual company issue, site approval, signature or completed operational evidence.
Provide the site/task-specific site specific confined space rescue plan and retain its controlled output.
Purpose scope and accountable roles
BULK; RETAIL. Apply where the site/activity/hazard is present; confirm in the site applicability assessment. Ten English petrol/diesel forecourts and convenience shops, HQ and mobile support. The additional bulk establishment is a separate illustrative scenario. Inventory, regulatory applicability, permissions and site-specific acceptance are unresolved.
Engineering and asset integrity manager owns delivery of this plan. Operations secures staffing and resources; engineering, the HSE lead and relevant competent specialists confirm technical and legal prerequisites. The board resolves constraints affecting critical controls.
Planned arrangements
Identify spaces and specified risks, including risks created by the proposed work. Evaluate remote inspection and cleaning methods first. Record why entry cannot reasonably be avoided before planning entry.
Unavoidable entry requires a competent safe system covering isolation, ingress, atmosphere, ventilation, equipment, people, communications and supervision. Set task-specific acceptable conditions and monitoring through competent assessment.
Required planning outputs
Rescue method/equipment: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Trained team: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Access constraints: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Emergency services interface and exercise evidence: the owner establishes the actual requirement and retains the evidence, accepted limits and unresolved actions in the linked site or task record. The example supplies no local layout, contact, inventory or technical value.
Delivery verification and review
Prepare practicable rescue arrangements before work, with capable people and available equipment. Test the actual alarm, access and recovery method. Calling the emergency services alone is not an adequate rescue plan.
| Stage | Example management arrangement |
| Before the activity | Owner confirms the scope, competent people, current information and permissions. Open critical prerequisites prevent release. |
| At implementation | Site supervisor verifies the physical arrangement and understanding. Engineering checks the accepted technical criteria for the affected equipment. |
| After change or failure | Suspend the affected scope, assess the changed risk, update information and brief people before a new decision. |
| Planned review | Owner reviews at a justified risk-based interval. Area management challenges evidence and independent assurance samples effectiveness. |
Stop escalation and return
No entry without verified safe conditions and effective rescue arrangements. Evacuate on alarm, communication loss, ventilation failure or any changed condition; never attempt unplanned entry rescue.
The person controlling the activity makes it safe and informs the site manager. The relevant competent specialist verifies the failed or uncertain safeguard. Operations authorises any restart separately after technical acceptance, applicable permissions, work coordination and a fresh briefing. Record all continuing restrictions.
Worked decision
A tank-entry proposal has gas-testing equipment but no workable casualty-recovery arrangement. Entry is refused. The entry authority and specialist team review avoidance and rescue feasibility before any fresh entry decision.
This invented case illustrates a decision and any continuing hold. It is not evidence that Crownway has completed an inspection, test, exposure evaluation or regulatory submission.
Guidance and related arrangements
Primary guidance 1
Primary guidance 2
How should confined spaces be controlled?
Crownway document overview
Primary guidance checked 10 November 2026 for the described arrangements. Linked legal-register entries keep their own review dates and territorial conditions. Guidance, ACOPs, company controls and direct statutory duties are distinct.
Primary references: introduction | legislation