Temporary works, structural stability and demolition

Connect temporary works, structural stability and safe demolition sequences.
Full public teaching and readers are free to read without an account. A free learner account is required for confirmed saved assessment, completion and certificate records in the LMS.
What you will work through
Fictional Millbank Frame project: new concrete, steel erection and selective demolition share a constrained site. You assess readiness and evidence; competent design, checking and site roles retain technical and release authority.
The course has 5 modules and 18 lessons, with teaching, applied activities, feedback and a check of understanding throughout. There are 4 practice pauses in the actual construction model, with an equivalent accessible text route. Public interactive practice is separate from confirmed LMS assessment and completion records.
Explore the interactive practice copy. Return to the LMS route for recorded learning.
Learning outcomes
- Connect temporary-works design and release conditions with the actual construction sequence.
- Identify structural and demolition information needed before removing or changing support.
- Recognise when changed loads, incomplete stability or missing verification require a hold.
Course outline
Understand structural risk
- Follow the load pathStructural stability must be established for the actual intermediate stage before the load path is changed.
- Recognise temporary works in ordinary tasksSuitability belongs to the whole arrangement, not just the component label.
- Roles, design briefs and coordinationCoordination must have the competence, authority and resources to keep work within the accepted arrangement.
- Design assumptions and ground conditionsThe actual bearing condition must satisfy the assumptions behind the accepted support arrangement.
Design and release temporary works
- Checking, installation and controlled releaseAccepted design and verified installation are separate necessary parts of controlled release.
- Formwork, falsework and placement readinessThe protective conditions must exist before wet-concrete loading begins.
- Control the pour and its interruptionsMonitoring and a reliable immediate stop arrangement must remain effective throughout placement.
- Curing, loading and prop removalSupport changes require competent assessment of the actual load path and stage, before alteration.
Build and handle safely
- Steel erection and temporary stabilityCrane release depends on verified stability at this erection stage, not final-frame appearance.
- Rebar, projections and handling controlsProtection must match the serious harm mechanism, including a foreseeable fall onto reinforcement.
- Concrete pumping, blocked hoses and interfacesStopping the controls does not prove a concrete line is free of stored energy; safe intervention needs the competent equipment-specific method and exclusion.
- Survey the structure before demolitionSurvey scope and limitations must match the proposed work before destructive disturbance.
Demolish in sequence
- Sequence and stability during removalThe sequence must maintain stability after every removal and departures require competent acceptance.
- Exclusion, debris and the public boundaryExclusion must follow the actual hazard and method rather than convenient site boundaries.
- Change, deterioration and stop decisionsIntervening damage can invalidate the accepted condition even when the structure still looks stable.
- Inspection, handover and evidenceEvidence must identify the same actual stage, configuration and authorised conditions.
Prove the decision
- Capstone: the prop removal requestA temporary change to a load path requires the same disciplined technical and release process as a planned change.
- Your stability control planChoose a testable management improvement while keeping specialist and operational authority with the appropriate people.
Assessment and completion
Complete the required lessons and activities, then take the 20-question final assessment. The pass threshold is 80% plus every designated critical safety answer. Points and badges cannot compensate for a critical error.
Use the LMS to save and resume confirmed progress. Certificate availability follows its passed-completion and grade conditions. Browser practice and printed learning pages do not issue the official LMS record.
Independent construction learning. Completion records learning within the course scope; competent site assessment, practical training and task authorisation remain necessary. It does not confer a NEBOSH qualification.
Sources and learning provenance
The teaching draws on public SHAREhub topic pages and structured source records, with original fictional workface cases. Use the linked primary guidance and the applicable jurisdiction when planning a live task.
- HSE: Temporary works
- HSE: Structural stability during alteration, demolition and dismantling
- HSE: Steel erection
Topic records, source IDs and versions
| Public topic section | Chunk and version | Jurisdiction and source IDs |
|---|---|---|
| construction-work-at-height-demolition-and-excavation · temporary-works | construction-work-at-height-demolition-and-excavation--temporary-works Version 20261016-letter-review-1 | Great Britain, Northern Ireland source-cwde-hse-height, source-cwde-hse-demolition, source-cwde-hse-excavation, source-cwde-ni-cdm, source-cwde-hse-temp, source-cwde-hse-stability |
| foundations-of-construction-health-and-safety-management · temporary-works | foundations-of-construction-health-and-safety-management--temporary-works Version 20261016-letter-review-1 | Great Britain hse-priced-l153-pdf, hse-cis64-excavations, hse-scaffold-design-inspection |
| foundations-of-construction-health-and-safety-management · construction-control-gates | foundations-of-construction-health-and-safety-management--construction-control-gates Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-cdm-2015, hseni-articles-construction-design-and-management-regulations-northern-ireland-2016, hse-priced-l153-pdf, hse-hsg47-underground-services, hse-cis64-excavations, hse-scaffold-design-inspection, hse-height |
| foundations-of-construction-health-and-safety-management · site-assessment | foundations-of-construction-health-and-safety-management--site-assessment Version 20261016-letter-review-1 | Great Britain hse-priced-l153-pdf, hse-hsg47-underground-services, hse-cis64-excavations, hse-scaffold-design-inspection, hse-height |
| construction-work-at-height-demolition-and-excavation · evidence | construction-work-at-height-demolition-and-excavation--evidence Version 20261016-letter-review-1 | Great Britain, Northern Ireland source-cwde-hse-height, source-cwde-hse-demolition, source-cwde-hse-excavation, source-cwde-ni-cdm |
| foundations-of-construction-health-and-safety-management · activities | foundations-of-construction-health-and-safety-management--activities Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-cdm-2015, hseni-articles-construction-design-and-management-regulations-northern-ireland-2016, hse-priced-l153-pdf, hse-hsg47-underground-services, hse-cis64-excavations, hse-scaffold-design-inspection, hse-height |
| foundations-of-construction-health-and-safety-management · supervisor-decisions | foundations-of-construction-health-and-safety-management--supervisor-decisions Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-cdm-2015, hseni-articles-construction-design-and-management-regulations-northern-ireland-2016, hse-priced-l153-pdf |
| foundations-of-construction-health-and-safety-management · evidence | foundations-of-construction-health-and-safety-management--evidence Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-cdm-2015, hseni-articles-construction-design-and-management-regulations-northern-ireland-2016, hse-priced-l153-pdf |
| construction-work-at-height-demolition-and-excavation · planning | construction-work-at-height-demolition-and-excavation--planning Version 20261016-letter-review-1 | Great Britain source-cwde-hse-cdm, source-cwde-hse-stability, source-cwde-hse-excavation, source-cwde-hse-height |
| manual-handling · assessment-boundaries | manual-handling--assessment-boundaries Version 2.0 | Great Britain, Northern Ireland hse-manual, hse-l23, hse-mac, hse-toolkit, hse-toolfaq, hse-filters, hseni-manual |
| work-equipment · isolation | work-equipment--isolation Version 3.0-row-context | Great Britain, Northern Ireland source-maintenance, source-l22, source-electricity, source-puwer_overview |
| demolition · survey | demolition--survey Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-stability, hse-survey, hseni-survey |
| demolition · sequence | demolition--sequence Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-demolition, hse-stability, ni-cdm |
| demolition · public | demolition--public Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-demolition, ni-cdm |
| demolition · stability | demolition--stability Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-stability, ni-cdm |
| demolition · controls | demolition--controls Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-stability, ni-cdm, hse-hierarchy, hse-dust, gb-coshh, ni-coshh, share-hierarchy-iosh |
| foundations-of-construction-health-and-safety-management · construction-scenarios | foundations-of-construction-health-and-safety-management--construction-scenarios Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-cdm-2015, hseni-articles-construction-design-and-management-regulations-northern-ireland-2016, hse-priced-l153-pdf |
| foundations-of-construction-health-and-safety-management · construction-assurance | foundations-of-construction-health-and-safety-management--construction-assurance Version 20261016-letter-review-1 | Great Britain, Northern Ireland hse-cdm-2015, hseni-articles-construction-design-and-management-regulations-northern-ireland-2016, hse-priced-l153-pdf |
Course version 2026.10.20.4 · SH-TWD-01. Factual source identity and jurisdiction are retained in the .
Questions about this course
Is this course free?
Yes. The training is £0. Full public teaching and readers can be used without an account. A free learner account is required for confirmed saved assessment, completion and certificate records in the LMS.
How long should I allow?
Approx. 2h 10m–3h 10m: approximately 130–190 minutes of self-paced learning, including required activities and one final-assessment attempt. Your pace, review and retries may increase the time. Save and resume in the LMS.
Can I study without a 3D-capable browser?
Yes. The complete learning reader is available in ordinary HTML. Where this course includes model practice, an accessible text route provides the same decision sequence. Use the interactive LMS course to complete its assessed requirements.
What do I need to pass?
Complete the required learning and achieve at least 80% in the final assessment, with every critical safety answer correct. Follow the feedback and review the relevant lesson before retrying.
Where is my completion record?
The LMS holds confirmed grades, completion and certificate records for your learner account. Public browser practice has its own separate progress and is not an official completion record.
Does completion authorise construction work?
Independent construction learning. Completion records learning within the course scope; competent site assessment, practical training and task authorisation remain necessary. It does not confer a NEBOSH qualification.
Presentation and model workshop
Use the same course imagery, worked decisions and source case in a 28-slide teaching companion. Practise classification, compare explained choices and inspect the linked model case.
Open the interactive presentation workshop · Download PowerPoint
This optional companion does not replace the required course activities or final assessment.